This project included system sizing assessments, unit positioning, refrigerant piping, electrical connections, and final commissioning. Installation was completed in line with Australian standards and manufacturer specifications.
Accurate installation ensured balanced airflow, effective temperature control, and long-term system performance.
Challenge of Project
Each installation site presented unique challenges such as building layout, electrical capacity, and compliance requirements. The key challenge was delivering a seamless installation while minimising disruption.